top of page

Houston Montrose area mixed-use commercial developer seeking help from city of Houston, TX.

The improvement was pegged to get things started in mid-2016, yet no soil has moved yet. Fred Sharifi, who's behind SFT Investments, said that the venture ought to get things started in January or February 2017 the length of preleasing advances well. Sharifi wants to have the venture more than 50 percent preleased by March.One of the most recent blended utilize advancements in progress inside the Loop guarantees boutique office space, space for nearby retailers and present day completes, once it defeats a modest bunch of challenges.The Fairview District in Montrose, which has been in the arranging stages since at any rate December 2015, will contain four structures totaling 60,000 square feet and a five-story parking structure. The venture's designer, SFT Investments, as of late held CBRE to rent its office space and Dallas-based Edge Realty Partners' Houston office to rent its retail space.

Maybe considerably more basic than preleasing, however, is Sharifi's requirement for help from the city of Houston. Sharifi said he's working with the city on getting budgetary help for foundation changes to Fairview Street, Taft Street, the encompassing walkways and sewer lines.

"Now, the numbers may not work (without city help)," Sharifi said. "We are working hard to get this going. We require assistance from the city to make this venture happen." Sharifi assessed the cost of the required foundation enhancements as being generally $2 million. City of Houston authorities didn't react to demands for input. The venture likewise falls inside the fringes of the recently framed Montrose TIRZ, or Tax Increment Reinvestment Zone, which ought to have the capacity to give money related help, also, Sharifi said. The TIRZ was framed not exactly a year back. Stores from that will go toward repairing and upgrading Montrose foundation, for example, new walkways and repairs to the waste framework.

At the point when a TIRZ is framed for a region, property charges are solidified at the rate they were in the year the TIRZ was made. The extra assessments gathered every year are coordinated to the TIRZ for framework enhancements that support improvement in the region.


Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page